Concrete blocks around the Monument
Concrete blocks have been laid over DPM to give the levels for the scaffolding. The DPM protects the paving stones underneath.

steel joists arrive for the base of the scaffolding
Steel joists arrive, which will form the base for the scaffolding

Steel joists being placed around the base of the Monument
Steel joists being hoisted into position

Smaller joists being carried
Smaller steel joists for the scaffolding base

The steel joists will form a base for the scaffolding
The steel joists provide a base for the scaffolding

Removing the internal grilles over the niches
All of the internal grilles have now been carefully
removed and an internal scaffolding in the centre
of the spiral staircase has been erected.