10th December 2008

Images by Harris Digital Productions

A stonemason polishing up one of the new black limestone step inserts

A stonemason polishing up one of the new black limestone step inserts before it is fitted inside the Monument

Steps inside the Monument

The last few steps are now ready to have the new stone inserts fitted

Mixing the fixing compound

Mixing the fixing compound used for fixing the new stone treads

A mason prepares one of the treads for the mixing compound

A mason prepares one of the treads for the mixing compound to be applied prior to the new stone being fitted

The underside of the new treads

The underside of the new treads also have to be prepared ready for the fixing compound

The fixing compound

The fixing compound is applied to the prepared step

buttered up

The underside of the bullnose is "buttered up" prior to fixing

CWO stonemason Mariusz

CWO stonemason Mariusz gets ready to lay one of the new black limestone step inserts

The new tread

The new tread is carefully laid into position

The new steps are positioned

The new steps are positioned carefully by hand

Excess bedding compound being trowelled off

The excess bedding compound is trowelled off

Cleaned off with a sponge and clean water

The bedding mortar is cleaned off with a sponge and clean water

Work is underway to remove the concrete bases that the scaffold has stood on

Now that the scaffold is gone work is underway to remove the concrete bases that the scaffold has stood on. Repairs will then be carried out to the lower areas of the stonework

The east elevation of the Monument

The east elevation of the Monument with the scaffold removed

The turnstile niche on the north wall

The turnstile niche on the north wall is being prepared for a lime render repair

The concrete bases are being carefully broken up

The concrete bases are being carefully broken up and removed