Gary Phillips at high level within the Monument wet brushing with a stiff brissle brush and clean water to the underside of the steps
Gary Phillips at high level within the Monument wet brushing
with a stiff brissle brush and clean water
to the underside of the steps

William spraying clean water to the underside of the steps
William spraying clean water to the underside of the steps

Billy, down in the basement lifting the dust from the floor
Billy, down in the basement lifting the
dust from the floor

500x500x50mm removal of clay substrate
500x500x50mm removal of clay substrate (in the basement)

Scaffolding reaches level 21
Scaffolding reaches level 21

Scaffolding reaches level 21
Scaffolding reaches level 21

Scaffolding reaches level 21
Scaffolding reaches level 21