A trench has been dug so that cables can be laid to supply telephone, computer & fire alarm systems

A trench has been dug so that cables can be laid to supply telephone, computer & fire alarm systems into the Monument

The new stone steps have been fitted

Although very dusty, you can now see all of the new stone steps have been fitted

Window 1 above the entrance door

Window 1 above the entrance door is now ready for the restored iron window to be refitted

The new mesh

Look at the quality of the new mesh

See the latest views of the City from the Monument viewing platform

A view from inside the new viewing gallery cage

A view from inside the new viewing gallery cage looking west with St Pauls Cathedral in the background

A view of the flaming orb seen from the viewing platform

A view of the flaming orb seen from the viewing platform. The small circular plate on the left is for the fixing of a new cctv camera

The east & north elevations of the pedestal

The east & north elevations of the pedestal are looking good now that the scaffold is gone