Menu:

19th February 2008

Photos by Harris Digital Productions

Specialist metalworkers setting out the armatures inside the drum
Specialist metalworkers setting out the armatures inside the drum

Carefully drilling the metal armatures inside the drum
Carefully drilling the metal armatures inside the drum

Clamp holding the steels in place ready for fixing
Clamp holding the steels in place ready for fixing

One section of the metal cage with the new metalwork in place
One section of the metal cage with the new metalwork in place

Nylon washer before being tightened
Nylon washer before being tightened

Fixings being tightened by hand
Fixings being tightened by hand

Metalworker carrying a section of the new armature up the narrow staircase inside the drum
Metalworker carrying a section of the new armature up the narrow staircase
inside the drum

Removing by hand the old cement mortar that covered the lightning tape within the plinth on the north elevation
Removing by hand the old cement mortar that covered the lightning tape within the plinth on the north elevation

Printable version Printable
Last updated: 29 November, 2008