Diary 19th February 2008

Specialist metalworkers setting
out the armatures inside the drum

Carefully drilling the metal armatures inside the drum

Clamp holding the steels in place ready for fixing

One section of the metal cage with the new metalwork in place

Nylon washer before being tightened

Fixings being tightened by hand

Metalworker carrying a section of the
new armature up the narrow staircase
inside the drum

Removing by hand the old cement mortar that covered the lightning tape within the plinth on the north elevation
Printable
Last updated:
3 October, 2008


