Diary 21st November 2007

Cleaning the egg and dart using the Jos system

The Drum area after cleaning

The Drum area after cleaning and with the old grey cement pointing
replaced with a far more sympathetic mortar

Top of Drum area after cleaning. Note the dark cement pointing.
Also the spalled stone caused by rusting iron cramps

Initial marking up for proposed stone repairs

Marking up for repair to failed previous repair

Cutting out cement mortar from joints on the column

Removal of cement pointing with hand tools
Printable
Last updated:
3 October, 2008


