Diary 26th March 2008

The second installation of the hoarding artwork

Removing a loose iron baluster from the internal staircase

Using a purpose made template to mark out position of armatures

Drilling the sequence of holes for the armatures

Connecting armatures with stainless steel wire

Applying resin to step

Applying resin to step
Printable
Last updated:
3 October, 2008


