5 October 2007

The scaffolding company, Allen and Foxworthy have erected 73,500ft of scaffolding tube, 24,500 scaffold fittings, 47,600 bolts tightened and 19,500 ft of scaffolding boards. Excavations and defrassing is carried out in the basement.
The scaffolding company, Allen and Foxworthy have erected 73,500ft of scaffolding tube, 24,500 scaffold fittings, 47,600 bolts tightened and 19,500 ft of scaffolding boards. Excavations and defrassing is carried out in the basement.

 

The 'egg and dart' under the viewing gallery
The ‘egg and dart’ under the viewing gallery

 

Lower section of the golden orb
Lower section of the golden orb

 

Top section of the golden orb, with Tower Bridge in the background.
Top section of the golden orb, with Tower Bridge in the background.

 

Gary Phillips, defrassing (removing lose material) in the basement
Gary Phillips, defrassing (removing lose material) in the basement

 

Ian Foss, carrying out an excavation in the basement
Ian Foss, carrying out an excavation in the basement